Miller Electric A.B.B. Robot Interface Gas Control Hub And Spindle Owner's Manual

Browse online or download Owner's Manual for Welding System Miller Electric A.B.B. Robot Interface Gas Control Hub And Spindle. Miller Electric A.B.B. Robot Interface Gas Control Hub And Spindle Owner`s manual User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Hub And Spindle

A.B.B. Robot InterfaceGas ControlHub And SpindleProcessesOM-884 117 005GFebruary 2000DescriptionAutomatic Welding InterfaceAutomatic WeldingVisit our

Page 2 - From Miller to You

OM-884 Page 6Le rayonnement de l’arc du procédé de soudagegénère des rayons visibles et invisibles intenses(ultraviolets et infrarouges) susceptibles

Page 3 - TABLE OF CONTENTS

OM-884 Page 71-3. Dangers supplémentaires en relation avec l’installation, le fonctionnementet la maintenanceRisque D’INCENDIE OUD’EXPLOSION.D Ne pas

Page 4

OM-884 Page 81-4. Principales normes de sécuritéSafety in Welding and Cutting, norme ANSI Z49.1, de l’American Wel-ding Society, 550 N.W. Lejeune Rd,

Page 5 - 1-2. Arc Welding Hazards

OM-884 Page 9SECTION 2 – INSTALLATION2-1. SpecificationsDimensions WeightComponent Height Width Depth Net ShipRobot Interface22-1/2 in.(572 mm)16-1/2

Page 6

OM-884 Page 102-3. Connection DiagramRef. S-02901 Robot Interface2 115 Volts AC/Contactor AndOutput Control Cord3 Welding Power Source4 Weld Cables5 S

Page 7

OM-884 Page 112-5. Shielding Gas Connection To Regulator/Flowmeterssb3.1 5/94 – ST-158 697-AObtain gas cylinder and chain to runninggear, wall, or oth

Page 8 - 1-5. EMF Information

OM-884 Page 122-7. Arc Sensing ConnectionsST-121 083-ALocate arc sensing cord, andconnect 4-socket plug toreceptacle RC12 on robotinterface. To make c

Page 9 - UTILISATION

OM-884 Page 132-9. 24-Socket Receptacle RC17 InformationSocket* Socket InformationA Provides connection to 2TA; for customer use.BCurrent Detect outpu

Page 10 - OM-884 Page 6

OM-884 Page 142-10. Arc Failure Light ConnectionsS-0292. Arc Failure light on robot inter-face front panel turns on and offby a signal from robot cont

Page 11 - OM-884 Page 7

OM-884 Page 152-11. Matching Digital Voltage Control (DVC) Board To Welding Power SourceRef. ST-119 647-C / SB-152 372 / S-150 864-C1 DVC Board PC12 D

Page 12

Miller Electric manufactures a full lineof welders and welding related equipment.For information on other quality Millerproducts, contact your local M

Page 13 - SECTION 2 – INSTALLATION

OM-884 Page 162-12. Hub Assembly InstallationST-126 870-A1 Spool Support2 Hub Support Shaft3 Retaining Ring4 Hub Assembly5 Brake Washer6 Fiber Washer7

Page 14 - 2-3. Connection Diagram

OM-884 Page 172-14. Installing Optional Reel-Type WireST-161 000-A / ST-152 463 / Ref. ST-157 999-A1 Retaining Ring2 Lock3 Spanner Nut4 Wire Retainer5

Page 15 - ST-080 485-A

OM-884 Page 183-2. Work Clampsb4.1 2/931 Work ClampConnect work clamp to a clean,paint-free location on workpiece, asclose to weld area as possible.Us

Page 16 - 2-7. Arc Sensing Connections

OM-884 Page 193-4. Indicator LightsRef. ST-119 645-A1 Gas Indicator LightGas sight turns on when the gasvalve is energized to indicateshielding gas fl

Page 17

OM-884 Page 203-5. Burnback ControlRef. ST-119 647-C / SB-191 630Burnback circuitry keeps weldingwire from sticking to workpieceafter arc is extinguis

Page 18

OM-884 Page 21SECTION 4 – SEQUENCE OF OPERATION4-1. Input/Output SignalsST-094 382-BRobot interface receives inputsignals for contactor control, gasco

Page 19 - S-150 864-C

OM-884 Page 22SECTION 5 – MAINTENANCE & TROUBLESHOOTING5-1. Routine MaintenanceY Disconnect power before maintaining.3 MonthsReplaceunreadablelabe

Page 20 - ST-161 001

OM-884 Page 235-3. Overload ProtectionRef. ST-800 185-A / ST-119 644-BIf fuse F1 opens, the robot interfaceshuts down. To check or changeF1, proceed a

Page 21 - SECTION 3 – OPERATION

OM-884 Page 24REAR VIEW OF DISPLAY BOARD PC4Input Command ForWire Speed IPM Meter0.8V = 800 IPMInput Command ForVolts Meter –0.5V = 50VPower Supply Fo

Page 22 - 3-3. Front Panel Controls

OM-884 Page 255-5. TroubleshootingY Disconnect power before troubleshootingTrouble RemedyNo arc voltage control.Check and secure output control connec

Page 23 - 3-4. Indicator Lights

TABLE OF CONTENTSSECTION 1 – SAFETY PRECAUTIONS - READ BEFORE USING 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1. Symbol Usage 1. . .

Page 24 - 3-5. Burnback Control

OM-884 Page 265-6. Use Of Indicator Lights For TroubleshootingGas Indicator LightOn OffGas flows: Gas does not flow: Gas flows: Gas does not flow:Syst

Page 25 - 4-1. Input/Output Signals

OM-884 Page 27SECTION 6 – ELECTRICAL DIAGRAMS151 242-EFigure 6-1. Circuit Diagram For Robot Interface

Page 26 - 5-1. Routine Maintenance

OM-884 Page 28SECTION 7 – PARTS LISTSC-119 647-A1234567891011 12 13 14 151617181920212223242526272829Fig 7-2530313233343536. Hardware is common andnot

Page 27 - 5-3. Overload Protection

OM-884 Page 29DescriptionPartNo.Dia.Mkgs.ItemNo.Figure 7-1. Control BoxQuantity(Continued)19 175 115 CABLE, interconnecting (consisting of) 1. . . .

Page 28

OM-884 Page 30123456789101112131415161718192021 22 2324252612. Hardware is common andnot available unless listed.119 648-CFigure 7-2. Control Panel, w

Page 29 - 5-5. Troubleshooting

OM-884 Page 31DescriptionPartNo.Dia.Mkgs.ItemNo.Figure 7-2. Control Panel, w/Components (Fig 7-1 Item 23)Quantity1 PC2 071 642 CIRCUIT CARD, motor spe

Page 30 - OM-884 Page 26

OM-884 Page 32DescriptionPartNo.Dia.Mkgs.ItemNo.Figure 7-3. Hub & Spindle AssemblyQuantity1 072 094 HUB & SPINDLE, (consisting of) 1. . . . .

Page 31 - OM-884 Page 27

OM-884 Page 33DescriptionPartNo.Dia.Mkgs.ItemNo.Figure 7-4. Control Box, GasQuantity1 134 327 LABEL, warning general precautionary 1. . . . . . . . .

Page 33 - OM-884 Page 29

Warranty Questions?Call1-800-4-A-MILLERfor your localMiller distributor.miller_warr 7/00Your distributor also givesyou ...ServiceYou always get the fa

Page 35 - OM-884 Page 31

PRINTED IN USA  2000 Miller Electric Mfg. Co. 6/00Miller Electric Mfg. Co.An Illinois Tool Works Company1635 West Spencer StreetAppleton, WI 54914 US

Page 36

OM-884 Page 1SECTION 1 – SAFETY PRECAUTIONS - READ BEFORE USINGsom _nd_5/971-1. Symbol UsageMeans Warning! Watch Out! There are possible hazardswith t

Page 37

OM-884 Page 2Arc rays from the welding process produce intensevisible and invisible (ultraviolet and infrared) raysthat can burn eyes and skin. Sparks

Page 38 - OM-884 Page 34

OM-884 Page 31-3. Additional Symbols For Installation, Operation, And MaintenanceFIRE OR EXPLOSION hazard.D Do not install or place unit on, over, or

Page 39 - Effective January 1, 2000

OM-884 Page 41-5. EMF InformationConsiderations About Welding And The Effects Of Low FrequencyElectric And Magnetic FieldsWelding current, as it flows

Page 40 - Owner’s Record

OM-884 Page 5SECTION 1 – CONSIGNES DE SECURITE – LIRE AVANTUTILISATIONsom _nd_fre 5/971-1. Signification des symbolesSignifie Mise en garde ! Soyez vi

Comments to this Manuals

No comments